CALGARY - SAJA - Upgrade Card Readers, Lenel and Security Cameras

Buyer

Infrastructure

Country

CA

Source Portal

Alberta Purchasing Connection

Deadline

08 October 2026

Estimated Value

Not specified

Published

21 September 2026

Description

Alberta Infrastructure has requested that the existing Lenel Access Control System (hardware and software) be replaced with a new Access Control Syste...

m (ACS) that meets Infrastructure Design Specifications. This includes the replacement of all servers, workstations, controllers and door hardware associated with the (90) doors currently using the Lenel system. The (90) doors consist of (20) hardwir

🔓 Sign up free to read the full description and access 177,000+ tenders

Get instant access to complete tender details, deadlines, and AI-powered matching.

Create Free Account

Already have an account? Sign in

Alberta Infrastructure has requested that the existing Lenel Access Control System (hardware and software) be replaced with a new Access Control System (ACS) that meets Infrastructure Design Specifications. This includes the replacement of all servers, workstations, controllers and door hardware associated with the (90) doors currently using the Lenel system. The (90) doors consist of (20) hardwired locations, (70) wireless door locks communicating through (10) wireless access points (WAP) and (5) maglock doors. The maglocks are to be removed and converted to electric strike doors. The new ACS must be able to integrate with Intrusion alarm devices to provide a single interface. The Synology Video Surveillance System (VSS) is also to be replaced with a new VSS that meets Infrastructure Specifications. The existing (82) camera system is to be replaced with a (66) camera system by upgrading legacy Panasonic and Eyesonic cameras with new high resolution multi-sensor cameras throughout the interior and exterior of the building. In addition to replacing the existing cameras, Alberta Infrastructure would like to add (14) new cameras to the parkade, which will require all new cabling and network infrastructure. Wherever possible Alberta Infrastructure would like to reuse existing cable and network infrastructure to reduce the overall cost of the project as well as minimize impact to operations of the Jubilee Auditorium. For complete work, please review the issued RFP Package.

Share this tender: 💼 LinkedIn 𝕏 Twitter ✉️ Email 💬 WhatsApp

Want AI-powered matching? Create your profile to see how well this tender matches your capabilities.